Infrastructure

 

INFRASTRUCTURE
 
STATUS OF INFRASTRUCTURE IN JNV’S
 
I
Area of land  allotted (in acres)
 Whether land transferred in the Name of Samiti
 Vidyalaya shifted to permanent buildings on
:      30
 
:     NO
  
:    1998
ii
Status of Boundary Wall
 a.  Brick Wall
b.  Barbed wire fencing
: (Completed / Incomplete)
 COMPLETED
BRICK WALL
iii
Permanent buildings constructed
 
: (CBRI pattern/ CPWD pattern)
 CPWD
iv
School building
 
: Complete / Incomplete
 COMPLETED
v
Dormitories
:  Boys 03.25 Nos.
   with Warden Residence  08 Nos.
 
 
:  Girls  02  Nos.
   with Warden Residence 02  Nos.
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
:  Complete / not complete, Area ______
 
TWO BATCHES
vii
Principal Residence
:  01  No.
viii
Staff Quarters
 
 
 
 
:      Type IV   =01Nos.
       Type III   =  17Nos.
      Type II     =  02Nos.
      Type  I     = 12 Nos.
  SP Sheds converted into Staff Qrs.:00 Nos.
ix
M.P. Hall
: Available
x
Workshop
: Not available
xi
Type of O.H. Tank
Its capacity
Present Status
: Column based
 :  1.35  lakhs of litres
 : Working satisfactory
xii
U.G. tank
 Its capacity
 Present Status
 :  1.35  lakhs of litres
 : Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available / not available
:  KIRLOSKAR make
:  10  KVA
:  Working
:  Year of procurement  1991
xiv
Sewage Pump
: _____-___ H.P.
xv
Water Pump
: ____-____ capacity
xvi
Electrification
 Electric connection
Sub Station building
Street lighting
 Numbers of hrs. during day when power supply is available on an average.
Urban Feeder
Complete
: 78  Nos. of Poles
:  16  hrs.
 
xvii
Playfields
 400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
: 200mtrs.Available
:  02___Nos.   – Available
:  02 _Nos.   – Available
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 : Potable,  05 Nos.-  working
: Potable, 02  Nos.-  working
: Not available.
xix
Rajiv Gandhi Smriti Van
:  Available
xx
Fire fighting arrangement
Refilling of cylinders to be done
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:
:
xxii
Whether area around transformer is fenced
:    No
xxiii
Whether open wells, if any, are covered from top
:   No open wells in the vidyalaya
xxiv
Works taken up under M&R fund during current year and last year:- 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2010-11
 
489352.00
 
 
2011-12
 
309552.00
Upto 31.01.2012